Preparations are ongoing for deployment of the lower marine riser package (LMRP) cap containment system. Remotely operated vehicles (ROVs) are engaged in preliminary operations, including preparing for operations to cut through and separate the damaged riser from the LMRP at the top of the Deepwater Horizon’s failed blow-out preventer (BOP).